SYMETAL SA – Stasinopoulos Group of Companies – Cleanroom

HVAC and CLEANROOM GRADE D design and construction for the production area of blistering foils of Symetal’s SA factory in Mandra, Attica.   The cleanroom formed to produce foils that are placed in the packaging of solid pharmaceutical preparations (blistering process for pharmaceutical oral dosages). Metals Industry Mandra, Attica 2019 The purpose of the project was … Read more

Forlabels SA – Industrial HVAC & Refrigeration

Printing Industry Schimatari, Viotia 2018 HVAC of a 40×23 m printing area at the company’s factory in Schimatari, Viotia. The aim of the project was to achieve the desired temperature and humidity conditions throughout the year and to ensure air purity in the printing area to achieve high quality result. More specifically: Desired room conditions … Read more

Chipita Poland – Industrial HVAC & Refrigeration

Confectionary & Sweets Tomaszów, Mazowiecki 2018 Project scope was: Design & installation of Ventilation & Air conditioning systems in the new Croissant Production Line Project requirements: Outdoor Design conditions Summer: Dry bulb Temp. 32oC, Wet bulb Temp. 23oC, (RH=47%) Winter: Dry bulb Temp. -18oC, RH=40% Indoor Zones Temperatures Summer: Dry bulb Temp. 27°C Winter: Dry … Read more

Fulgor SA – Degassing Air Processes

Cables Industry Korinthos, Greece 2014 & 2018 Project in submarines hyper high-voltage cables    The project: Fulgor SA, a member of Stasinopoulos group of companies, started the manufacturing of submarine high voltage cables, up to 200,000 Volts, for the transmission of electrical power under seawater. The project was implemented at Fulgor Plant in Korinthos, Greece. Our … Read more

Coca Cola Group – Industrial HVAC & Refrigeration

Soft Drinks Worldwide From 1990 Our Group has a stable and successful collaboration with Coca Cola Hellenic Bolting Company (HBC) from 1990 having executed HVAC projects for Coca Cola in the following locations: Schimatary, Greece Heriaklion Creta, Greece Aigio, Greece (Avra water) Rodos, Greece Mesologi, Greece (old factory) Abuja, Nigeria and for the subsidiary companies … Read more

FENIX Hotel – Commercial HVAC

Assembly Buildings Glyfada, Greece 2017 Our company has provided the central cooling and heating systems for FENIX Hotel, Glyfada Greece. The HVAC systems incorporated a special application which led to significant energy conservation in heating due to the fact room setting temperature and supplied hot water temperature is determined by ambient temperature by a special … Read more

Leroy Merlin – Commercial HVAC

Assembly Buildings Athens, Greece 2017 BCT Group designed & implemented the central cold and hot water system for the cooling and heating needs of the Leroy Merlin building on Vasilissis Sofias Street on behalf of the owner company DAKON Anaptyxiaki SA. More specifically, our company has successfully implemented:  the cold water system for air conditioning … Read more

Tsimis Printings SA – Industrial HVAC & Refrigeration

Printing Industry Lamia, Greece 2017 Tsimis S.A. is a Greek manufacturer of flexible packaging materials with a significant market share in Greece and increasing shares in export markets around Europe. Our company maintains a stable collaboration with Tsimis SA from more than two decades supporting the company on all HVAC, refrigeration, process cooling and ventilation … Read more

DEMO SA – Cleanroom

Life science Kryoneri, Attica 2017 Design, supply, installation, and commissioning of HVAC equipment that serve a dry powder filler Cleanroom GRADE A / B class, according to EU GMP for DEMO SA. Project Objectives Minimum space and absolutely stable conditions in summer: Room Temperature: 20οC Relative Room Humidity: 35% Constant air supply Constant overpressure between … Read more

Katiki, Domokou – Cleanroom

Dairy Domokos, Greece 2017 Project Objective:  Achieving ISO 8 clean space conditions with temperature and humidity control in two “Katiki” rooms at the factory in Domokos. These conditions were achieved in accordance with: ISO 8 or 100,000 clean space conditions according to FS 209 The two production rooms are in air overpressure 10 – 12 … Read more